INSTALLED BASE:



TURNKEY PROJECTS


Cobalt 60: Five cobalt 60 systems:

-	Al Bairouni University Hospital (Damascus), cobalt 60 (T780)
-	Al Bairouni University Hospital (Damascus), cobalt 60 (T1000)
-	Al Bairouni University Hospital (Damascus), cobalt (Elite 1)
-	Al Bairouni University Hospital (Damascus), cobalt (Elite 2)
-	Tishreen University Hospital (Lattakia), cobalt Equinox                        
                

Dual Head Gamma Camera:

-	Al Bairouni University Hospital, Vertex gamma camera, ADAC	
-	Al Bairouni University Hospital, BrightView gamma camera, PHILIPS 
-	Dr. Amer Sheikh Youssef, Forte gamma camera, PHILIPS 
-	Dr. Ghassan Ksayyer, Forte gamma camera, PHILIPS
-	Syrian Society Against Cancer, Forte gamma camera, PHILIPS 
-	Al Kindi Hospital, Forte gamma camera, PHILIPS 
-	Al Bassel Cardiac Institute, CardioMD gamma camera, PHILIPS                        
                

Radiotherapy Centers:

1)	Al Bairouni University Hospital, Damascus (2002)
        The first linear accelerator in Syria.	
        It was challenging for both, our company and the customers, to put such Hi-Tech equipment in operation for the first time in Syria:
        - Linear Accelerator
        - Simulator
        - T.P.S
2)	Al Amal Hospital, Homs (2003)
        The first private radiotherapy center in the country, with linear accelerator equipment
3)	Ministry of Health (M.O.H), Damascus (2005)
        - Linear Accelerator
        - Simulator
        - Treatment Planning System
        - Water phantom
        - Mold Room
4)	Tishreen University Hospital, Lattakia (2011)
        - Linear Accelerator
        - Simulator
        - Treatment Planning System
        - Water phantom
        - Mold Room
        - H.D.R		(the first H.D.R. in Syria)
        - Big Bore CT	(the first Big Bore CT in Syria)
        - Cobalt 60
        - Dosimeter equipment

PET/CT (2006)

The first PET/CT in Syria for Dr. Amjad Al Kadri


RECENT 2019 PROJECTS:

Recently, in 2019, we had two major projects:

Turnkey Project for a second radiotherapy center for Tishreen University Hospital in Lattakia:

    Consisting of the following:
    Site Preparation:
        -	Civil works for the whole site 
        -	Mechanical works for the whole site
        -	Electrical works for the whole site
        -	Two chillers 45 ton and 20 ton
        -	Two UPS systems, 120 kVa, 60 kVa
        -	Linac 4-ton door from the French manufacturer DIB Production
    Systems:
        -	Clinac iX linear accelerator
        -	Acuity simulator
        -	Eclipse treatment planning system
        -	Aria oncology information system
        -	Water phantom from PTW
        -	Mold Room from Bebig
    Training:
        -	4 weeks local on-site training for Linac 
        -	2 weeks local on-site training for Simulator
        -	4 weeks local on-site training for Treatment Planning system
    Commissioning:
        -	8 weeks commissioning for the complete radiotherapy network of equipment (Linac – T.P.S / Simulator)
    (see photos)
    

Al Bairouni Extension

    Extension to the existing radiotherapy center at Al Bairouni University Hospital
        -	Clinac SW upgrade
        -	4DTC upgrade
        -	MLC + PVI upgrade
        -	Acuity upgrade
        -	New Aria oncology information system
        -	New two Eclipse treatment planning system
    Training:
        Six weeks on-site training for:
        -	Admin and physics
        -	Eclipse operation
        -	Eclipse Clinac
        -	IMRT/physics/clinical school
        -	OIS Administration
        -	OIS Clinical Implementation
    (see photos)