IMATEC Installed Base
- Nuclear Medicine “ Gamma Camera & PET/CT”
- Radiotherapy Equipment
- Diagnostic CT Scanners
- Miscellaneous
TURNKEY PROJECTS

Cobalt 60: Five cobalt 60 systems:
- Al Bairouni University Hospital (Damascus), cobalt 60 (T780)
- Al Bairouni University Hospital (Damascus), cobalt 60 (T1000)
- Al Bairouni University Hospital (Damascus), cobalt (Elite 1)
- Al Bairouni University Hospital (Damascus), cobalt (Elite 2)
- Tishreen University Hospital (Lattakia), cobalt Equinox

Dual Head Gamma Camera:
- Al Bairouni University Hospital, Vertex gamma camera, ADAC
- Al Bairouni University Hospital, BrightView gamma camera, PHILIPS
- Dr. Amer Sheikh Youssef, Forte gamma camera, PHILIPS
- Dr. Ghassan Ksayyer, Forte gamma camera, PHILIPS
- Syrian Society Against Cancer, Forte gamma camera, PHILIPS
- Al Kindi Hospital, Forte gamma camera, PHILIPS
- Al Bassel Cardiac Institute, CardioMD gamma camera, PHILIPS
Radiotherapy Centers:
- Al Bairouni University Hospital, Vertex gamma camera, ADAC
- Al Bairouni University Hospital, BrightView gamma camera, PHILIPS
- Dr. Amer Sheikh Youssef, Forte gamma camera, PHILIPS
- Dr. Ghassan Ksayyer, Forte gamma camera, PHILIPS
- Syrian Society Against Cancer, Forte gamma camera, PHILIPS
- Al Kindi Hospital, Forte gamma camera, PHILIPS
- Al Bassel Cardiac Institute, CardioMD gamma camera, PHILIPS
Radiotherapy Centers:
1) Al Bairouni University Hospital, Damascus (2002)
The first linear accelerator in Syria.
It was challenging for both, our company and the customers, to put such Hi-Tech equipment in operation for the first time in Syria:
- Linear Accelerator
- Simulator
- T.P.S
2) Al Amal Hospital, Homs (2003)
The first private radiotherapy center in the country, with linear accelerator equipment
3) Ministry of Health (M.O.H), Damascus (2005)
- Linear Accelerator
- Simulator
- Treatment Planning System
- Water phantom
- Mold Room
4) Tishreen University Hospital, Lattakia (2011)
- Linear Accelerator
- Simulator
- Treatment Planning System
- Water phantom
- Mold Room
- H.D.R (the first H.D.R. in Syria)
- Big Bore CT (the first Big Bore CT in Syria)
- Cobalt 60
- Dosimeter equipment
5) Tishreen University Hospital, Lattakia (2019)
- Linear Accelerator
- Simulator
- Treatment Planning System
- Water phantom
- Mold Room
PET/CT (2006)
The first PET/CT in Syria for Dr. Amjad Al Kadri
Al Bairouni Extension
Extension to the existing radiotherapy center at Al Bairouni University Hospital
- Clinac SW upgrade
- 4DTC upgrade
- MLC + PVI upgrade
- Acuity upgrade
- New Aria oncology information system
- New two Eclipse treatment planning system
Training:
Six weeks on-site training for:
- Admin and physics
- Eclipse operation
- Eclipse Clinac
- IMRT/physics/clinical school
- OIS Administration
- OIS Clinical Implementation
TrueBeam PROJECT
In 2021, we installed TrueBeam system in Al-Bairouni Hospital in Damascus:
The Project Consisted the following:
Site Preparation:
- Civil, Mechanical, Electrical works for the whole site
- Two chillers 18 ton and 8 ton
- Two UPS systems, 120 kVA, 100 kVA
- Linac 5-ton door
Installation of the following Systems:
- TrueBeam linear accelerator
- Eclipse treatment planning system
- Aria oncology information system
- full set of dosimetry systems from PTW
Training: - 3 weeks local on-site training for Linac
- 1 week local on-site training for Treatment Planning system Commissioning:
- 8 weeks commissioning for the complete radiotherapy network of equipment (Linac – T.P.S)
Two Halcyon PROJECT:
In 2021, we installed TrueBeam system in Al-Bairouni Hospital in Damascus:
The Project Consisted the following:
Site Preparation:
- Civil, Mechanical, Electrical works for the whole site
- Two chillers 18 ton and 8 ton
- Two UPS systems, 120 kVA, 100 kVA
- Linac 5-ton door
Installation of the following Systems:
- TrueBeam linear accelerator
- Eclipse treatment planning system
- Aria oncology information system
- full set of dosimetry systems from PTW
Training:
- 3 weeks local on-site training for Linac
- 1 week local on-site training for Treatment Planning system
Commissioning:
- 8 weeks commissioning for the complete radiotherapy network of equipment (Linac – T.P.S)